General information about the ground area |
Planned use of ground area |
construction of the plant on production of forms for concrete products of LLC Vibor S |
Branch |
Manufacturing industry |
Address of the area |
Krasnodarskiy region Severskiy district, , Severskaya NIVA |
Cadastre account of ground area |
Registered |
Cadastre number of area/of quarter |
23:26:0101008:128, 23:26:0101008:29, 23:26:0101008:15 |
Declared area (m2) |
278913.00 |
Limit size of the area (m2) |
.00 |
Land category |
Agricultural land use |
Kind of allowed use |
Agricultural activity |
Actual use |
not used |
Permits, town-planning documentation |
Scheme of planning the territory. The General plan Seversky urban settlements, approved by Decision of the Board from 10.11.2011 ¹199 |
Information on a property |
Short description of property |
No |
Cost of property, million rub. |
.00 |
Information about proprietor (right holder) |
Proprietor |
Sikorsky Alexandr Pavlovich |
Right holder |
Sikorsky Alexandr Pavlovich |
Kind of right |
Constant (termless) using |
Information on the bankrupted enterprises |
Name of bancrupcy procedure, date of introduction |
no |
Market cost of the real estate (according to the report on an assessment in case of its carrying out). Total cost |
.00 |
Cost of land plot property |
.00 |
Information about encumbrance and limitation |
Kind of encumbrance, limitation |
is absent |
Encumbrance area |
.00 |
Electricity supply |
Power supply center (name, right-holder) |
Severskaya electrical substation open joint-stock company "Russian railways" |
Power supply center (electrotension class) |
Middle class of tension from 1 kV to 35 kV |
Power supply center (free power (MWt)) |
5.00 |
Power supply center (distance(m)) |
500.00 |
Nearest connection point (network tension, kV) |
10.00 |
Nearest connection point (distance(m)) |
500.00 |
Gas-supplying |
Gas pipeline (name, right-holder) |
Region Gas service |
Gas pipeline (diameter(mm)) |
100.00 |
Gas pipeline (pressure(MPa)) |
Average pressure pipelines from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) |
.00 |
Gas pipeline (distance(m)) |
5000.00 |
Nearest connection point (diameter(mm)) |
100.00 |
Nearest connection point (pressure (MPa)) |
Average pressure pipelines from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) |
.00 |
Nearest connection point (distance(m)) |
0.30 |
Water-supply |
Water supply source (name, right-holder) |
well drilling |
Water supply source (power (cubic meters a day)) |
.00 |
Water supply source (distance(m)) |
.00 |
Nearest connection point (power (cubic meters a day)) |
.00 |
Nearest connection point (diameter(mm)) |
.00 |
Nearest connection point (distance(m)) |
.00 |
Sewage system |
Type of building (name, right-holder) |
Construction of local cleaning systems |
Type of building (power (cubic meters a day)) |
.00 |
Nearest point of connection (distance(m)) |
.00 |
Installation of telephones/internet |
Central network (distance(m)) |
.00 |
Mobile communication (distance(m)) |
.00 |
Rated price of the ground area supplying with engineering, mln.rub. |
31.00 |