Project name |
Construction of the complex for breeding pigs |
Industry classification |
Agriculture |
Basic information about the project |
Project essence |
Construction of a pig-breeding complex includes: housing for boars and insemination; housing waiting; housing farrowing; housing rearing; housing for fattening; body quarantine; preparation center and warehouses; slaughter; workshop for meat processing and recycling |
Project capacity |
47,697 heads, 4 200 tons of meat per year |
Consumer market description |
Processing companies, wholesale companies, private sale |
Object construction term |
24.00 |
Competitive advantage |
Lack of competition in the Seversky district, a small number of such enterprises in the Krasnodar Territory |
Resource availability for project realization |
Availability of land necessary area, prime location, proximity to Communications |
Planned volume of resource consumption (annual) |
Planned volume of electricity consumption (annual), MWh |
1.30 |
Planned volume of gas consumption (annual), million cubic meters |
1.00 |
Planned volume of water consumption (annual), million cubic meters |
0.08 |
Degree of project development |
Designed business plan, ground plot is formed |
Financial estimation of the project |
Total cost of the project, mln rubles |
1106.20 |
Own resources, million rubles |
0.00 |
Means of regional (municipal) budget, million rubles |
0.00 |
Previously involved means, million rubles |
0.00 |
Investment capacity, mln rubles |
1106.20 |
Conditions of investor participation |
Direct investments |
Form of investments return |
Monetary |
Payback period |
5.50 |
Basic indicators of investment project economic efficiency |
Net present value (NPV) |
88.47 |
Simple payback time |
5.5 |
Discounted payback period |
7.75 |
Internal rate of return (IRR) |
24.8 |
Productivity index (PI) |
1 |
Income per year |
672 |
Social efficiency of investment project |
Number of workplaces |
141 |
Salary average level (thousand rub per year) |
288 |
Budgetary efficiency of investment project |
Mid-annual tax payments, million rubles |
129.04 |
which includes into consolidated budget of the krai, million rubles |
78.03 |
General information about the ground area |
Address of the area |
Seversky region , SEC " Niva" , section 92 , the circuit 87 , the circuit 250 |
Cadastre account of ground area |
Registered |
Cadastre number of area/of quarter |
23:26:0101000:1141; 23:26:0101000:1142 |
Declared area (m2) |
915600.00 |
Limit size of the area (m2) |
915600.00 |
Land category |
Agricultural land use |
Kind of allowed use |
Agricultural activity |
Actual use |
Growing alfalfa |
Availability of buildings, structures, constructions |
No |
Permits, town-planning documentation |
Plans urban planning area. The master plan of the Seversky rural settlement, approved by the Board of 10.11.2011g. ¹199 |
Information about proprietor (right holder) |
Proprietor |
Individuals ( shareholders ) |
Right holder |
Individuals ( shareholders ) |
Kind of right |
Another |
Information about encumbrance and limitation |
Kind of encumbrance, limitation |
No |
Encumbrance area |
0.00 |
Electricity supply |
Power supply center (name, right-holder) |
Severskieelectrosety, JSC "Kubanenergo" |
Power supply center (electrotension class) |
Middle class of tension from 1 kV to 35 kV |
Power supply center (free power (MWt)) |
0.10 |
Power supply center (distance(m)) |
3000.00 |
Nearest connection point (network tension, kV) |
10.00 |
Nearest connection point (distance(m)) |
50.00 |
Gas-supplying |
Gas pipeline (name, right-holder) |
Severskayaraigas |
Gas pipeline (diameter(mm)) |
100.00 |
Gas pipeline (pressure(MPa)) |
Average pressure pipelines from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) |
0.00 |
Gas pipeline (distance(m)) |
2000.00 |
Nearest connection point (diameter(mm)) |
100.00 |
Nearest connection point (pressure (MPa)) |
Average pressure pipelines from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) |
0.00 |
Nearest connection point (distance(m)) |
50.00 |
Water-supply |
Water supply source (name, right-holder) |
Drilling of an artesian well |
Water supply source (power (cubic meters a day)) |
0.00 |
Water supply source (quality of water) |
Service and drinking water |
Water supply source (distance(m)) |
0.00 |
Nearest connection point (power (cubic meters a day)) |
0.00 |
Nearest connection point (diameter(mm)) |
0.00 |
Nearest connection point (distance(m)) |
0.00 |
Sewage system |
Type of building (name, right-holder) |
Construction of local treatment facilities due to lack of capacity reserve |
Type of building (power (cubic meters a day)) |
0.00 |
Type of building (distance(m)) |
0.00 |
Nearest point of connection (power (cubic meters a day)) |
0.00 |
Nearest point of connection (diameter(mm)) |
0.00 |
Nearest point of connection (distance(m)) |
0.00 |
Installation of telephones/internet |
Central network (distance(m)) |
0.00 |
Mobile communication (distance(m)) |
0.00 |
Rated price of the ground area supplying with engineering, mln.rub |
50.00 |
Distance to the large settlements and objects of a transport infrastructure |
Remoteness from |
Name |
Distance (km) |
center of municipal formation |
Severskaya village |
5.00 |
nearest settlement |
8 marta village |
0.50 |
Center of federal subject |
Krasnodar city |
45.00 |
highways (regional, federal value) |
Federal auto road Êrasnodar-Novorossiysk |
7.00 |
highways of local value |
No name |
0.00 |
nearest railway station |
Severskaya station |
5.00 |
nearest railway |
RZD |
5.00 |
airport |
Krasnodar airport |
55.00 |
seaport |
seaport Novorossiysk |
120.00 |
Additional information about the ground area |
Special conditions |
The depth of freezing of soils: 0,69m Seismicity district: 8 points The relief is flat, it is no floodwater and waterlogged |
Cost of rent/buy of the ground area, mln. rub |
18.30 |
Geographical coordinates of object (dd.dddddd) |
Latitude (N) |
44.89128056 |
Longitude (E) |
38.68158333 |
Notes |
Changing the type of permitted use of ground possible after treatment of the investor in the administration of rural settlement Seversky |
Data on the project initiator (in case of existence information about the legal/physical person) |
Name / Full name |
Administration of Seversky district municipality |
Postal address |
69, Lenina st., Seversky vil., Krasnodar region, 353240 |
Site |
www.sevadm.ru; severskayainvest.ru |
Phone/fax |
7(86166) 2-17-51 |
E-mail address |
[email protected] |
Data about the applicant (executive authority/local government executive authority) |
Name |
Administration of Seversky district municipality |
Postal address |
69, Lenina st., Seversky vil., Krasnodar region, 353240 |
Site |
www.sevadm.ru; severskayainvest.ru |
Phone/fax |
7(86166) 2-17-51 |
E-mail address |
[email protected] |
Executive (Full name, work position, phone number) |
A. Patkin, main specialist of Department of economy, investments and forecasting, 88616621751 |